Pennsylvania Soil and Rock provided services to Plum Borough School district for the New Holiday Park Elementary School starting with the planning phase of the project up to and including the completion of the building construction monitoring. The two-story, 74,000 SF state-of-the art building and site construction was completed in 2015. PS&R completed the site geotechnical investigation, wetland delineation, NPDES permitting and E&S control plan, Landscaping plan, grading plan, site lighting planning, traffic studies, site surveying, storm drainage and utility profiles as well as the site geophysical study. The construction materials testing for the project included compaction testing, concrete testing, masonry inspection, surface bearing capacity verification, asphalt testing and structural steel inspection.